The main goal of the study was to evaluate the behaviour of the designed solution in what concerns to its stability, permissible overtopping and pressure exerted on the crown-wall. The planned reconstruction is part of a series of works to be carried out in the port, following the damage caused by Hurricane Lorenzo.
Institutions and Work Teams:
LNEC - Departamento de Hidráulica e Ambiente